Viking River Cruises · Viking Astrild

Levels relevant to this sailing

Departing Thursday 17 September 2026.

This page does not say whether your cruise will run. It shows what the rivers on your route are reading now, how far that sits from the water a ship of this size needs, which of your days are level-sensitive at all, and where to read the authority's and the operator's own pages.

Your itinerary, by kind of water

  1. Day 1 Berlin In port
  2. Day 2 Berlin In port
  3. Day 3 Potsdam; Wittenberg Free-flowing Elbe
  4. Day 4 Wittenberg In port
  5. Day 5 Meissen Free-flowing Elbe
  6. Day 6 Dresden Free-flowing Elbe
  7. Day 7 Bad Schandau Free-flowing Elbe
  8. Day 8 Děčín; Prague Free-flowing Elbe
  9. Day 9 Prague In port
  10. Day 10 Prague In port

5 of 10 days on this itinerary sit on free-flowing water, where the level is the constraint. 0 are held by locks, and 5 are alongside.

These chips describe the kind of water each day sits on — geography, not a forecast and not a judgment about your sailing. A day held by locks does not care about a drought upstream; a free-flowing day is where the level is the constraint.

The corridors this itinerary crosses

Waterlogged hull clear-line for Viking Astrild, using a draught of 1.45 m. A Waterlogged clear-line is our own arithmetic: the gauge reading at which the published reference depth, minus the ship's draught and a fixed safety allowance, still leaves a comfortable margin. It is not an operator's decision rule and no cruise line uses it.

History on this date

This is measured history, not a forecast and not an estimate of disruption probability.

Dresden

History on this date

The same-date history panel for this gauge is not available in this build.

This is measured history, not a forecast and not an estimate of disruption probability.

Rain in the next 14 days

Rhine above Kaub — representative catchment precipitation.

0.39 mm 2026-09-07
0.04 mm 2026-09-08
6.73 mm 2026-09-09
0.06 mm 2026-09-10
0.0 mm 2026-09-11
0.0 mm 2026-09-12
0.0 mm 2026-09-13
0.0 mm 2026-09-14
0.0 mm 2026-09-15
0.0 mm 2026-09-16
0.0 mm 2026-09-17
0.0 mm 2026-09-18
0.0 mm 2026-09-19
0.0 mm 2026-09-20

3 days: 7.2 mm · 7 days: 7.2 mm · 14 days: 7.2 mm — forecast precipitation.

Rain forecast by Open-Meteo (commercial licence), model icon_seamless · fetched 7 September 2026 at 21:16 UTC · covering 14 days, 7 September to 20 September.

Weather data by Open-Meteo (commercial licence) · Representative catchment precipitation total from 8 weighted sampling points; a point sample, not an areal mean.

Rain may slow a fall or create a rise after losses and routing. Waterlogged does not convert this forecast into gauge centimetres or a cruise-disruption probability.

Read a rain forecast at the source

What Viking publishes

Waterlogged does not interpret your contract and does not calculate what you may be owed. These are the operator's own pages and the dated facts we could establish about them.

  • Named disruption programme found: not found in the documents read
  • Terms differ by booking market: not established
  • Confidence in that finding: confirmed
  • Last checked: 2026-07-30

What we could not establish:

  • Whether the separate 'US Ports' version of the Passenger Ticket Contract (referenced but not fetched) differs materially for cruises touching a US port

Operator policies change without notice and differ by booking market and contract version. Waterlogged does not calculate your refund, credit, hotel entitlement or insurance payout, and does not determine cancellation rights or legal remedies. Read the operator's own documents and the terms attached to your booking, and do not cancel pre-emptively on the strength of river data alone.

Four questions worth asking your operator or agent:

  1. Which dated regional contract and disruption-program version applies to my booking?
  2. What does that document say for this specific itinerary change, and who decides whether it applies?
  3. What are the consequences if I cancel or reject a proposed change before the operator acts?
  4. What notice, evidence and deadline does the current document require, and where must it be sent?

Tell me when a gauge crosses a number

An alert here is a measured centimetre crossing on a named gauge — never a score, a probability or a changed opinion.

Request the Daily River Log Watch for this sailing. We keep the address only for that request: no marketing and no sale of the address. The morning email for a served sailing is sent each day until the morning after it ends; a sailing we do not serve sends nothing until we serve it. See Privacy for retention and deletion.

Keep my email for this sailing only, so Waterlogged can send me the Daily River Log Watch for it once this sailing is served. Nothing is sent until then. No marketing and no sale of my address. Delete it on request or no later than 180 days after the scheduled sailing. Privacy details: /privacy.

Operator policies change without notice and differ by booking market and contract version. Waterlogged does not calculate your refund, credit, hotel entitlement or insurance payout, and does not determine cancellation rights or legal remedies. Read the operator's own documents and the terms attached to your booking, and do not cancel pre-emptively on the strength of river data alone.